Jump to content
American Road Magazine
Celebrating our two-lane highways of yesteryear…And the joys of driving them today!

Ridge Route Update


Recommended Posts

From our ridgeroute.org website -

 

On Monday, June 10, Michael Ballard (myself), Harrison Scott, Dave Omieczynski, and Richard Valot had a meeting with representatives from the Angeles National Forest. They included Jerry Perez – Forest Supervisor, Justin Seastrand – Environmental Coordinator, Ricardo Lopez – Road Engineer, and Jamahl Butler – District Ranger. Our meeting, which was held on the Ridge Route near the southern end, was to discuss a range of topics regarding the road. We initially met at the Ridge Route and Templin Highway where we made introductions and briefly went over the meeting details. From there, I led the group with my sportbike up the road to the southern gate. At that point, we discussed the land ownership problems and the 2010 paving, which we believe will help us with our goal of getting the road reopened.

After our discussion, they opened the gate and I led the group on a tour of the Ridge Route from the southern gate to Reservoir Summit. The initial plan, however, was to only go about four miles north to see the recently reconstructed section of road. Each stop, the USFS people decided to go a bit further. We didn’t mind this at all! Along the way, we made stops at some of the sections of the roadway that had been repaired as well as some of the historic sites along the road, such as the National Forest Inn site. At each major stop, Scotty brought out his books and showed photos of the sites.

Once we got to Reservoir Summit, we had another discussion regarding the state of the roadway. Overall, it was in very good shape with only a few areas needing more immediate attention. Many sections had been resurfaced and we did make it clear that we didn’t want to see a wholesale repaving of the roadway for the sake of preservation. They seemed to understand this. After our discussion and hike to the reservoir, we all headed back to the southern gate to finalize our meeting.


The meeting was productive and positive. There is still a lot of work to be done, but they were willing to help and to work with us. Instead of a Memorandum of Understanding, we may be entering into a Volunteer Agreement regarding cleaning drains and such along the roadway. They also stated they would do additional research regarding the land ownership issue at the southern end of the roadway. In regards to opening the roadway, there is still no estimate on when it will reopen. Another concern is roadway maintenance, which we may be able to help defray with volunteer effort. There are still additional issues that need to be addressed but we at least have a better understanding of what the Forest Service sees as the problems. One of them, overall condition of the roadway and ability for vehicles to travel safely, I tried to prove by using my sportbike. If I can go on the roadway using that vehicle, most everyone should be able to pass over it safely as well.

Only time will tell if this meeting was truly successful, but I believe it was. I will give additional updates when we hear back from the USFS in the near future.

20190610_121043.jpg

20190610_122549.jpg

20190610_122555.jpg

  • Like 2
Link to comment
Share on other sites

  • 2 months later...

Our biggest hurdle seems to be the land ownership issue at the south end. The County of Los Angeles is to blame for that mess but we hope the federal government may have enough clout to get it fixed. Time will tell. In the mean time, we are working toward possibly starting up road repairs again.

Link to comment
Share on other sites

  • 2 months later...

Things are looking good on the Ridge Route front. Our volunteer agreement with the Angeles National Forest should be coming through soon. Once the fires calm down anyway, as they have been taking away the people that are working on it. Once it is in place, things will start to move a bit faster on our end. The road is still a ways from being open, but we should hopefully have some form of access.

Link to comment
Share on other sites

Perseverance is key with these things. We will succeed, it just may take a while. 

Link to comment
Share on other sites

  • 3 weeks later...

Big update coming soon. It looks like we may well have our volunteer agreement in place by early December. With this agreement comes a very important thing, a key. We will finally have full access to the Ridge Route. Right now we are anticipating having some sort of event, likely a road work type event, in late Spring 2020. I'll be going up on the road as soon as possible, after I get the key, to evaluate what is needed to be done.

Link to comment
Share on other sites

  • 3 weeks later...

Greetings all,

Finally, really good news. Last month was just “good news”. Now we’re on to really good news. Our Volunteer Service Agreement with the Angeles National Forest was finalized on December 11 and is now in effect. We will be getting a key to the gates within the next week.

Assuming weather and roadway conditions cooperate, I plan to make my first visit on the road, past the gates, on December 21st. The plan is to come from Sandberg and head to Castaic. It will be a lot of fun and an adventure. Yes, plenty of photos will be taken and posted. I haven’t fully traversed the road since about 2009 or 2010 at the latest.

With this agreement finally in place, we can begin to move forward with our portion of the physical preservation of the roadway. We are looking toward late Spring 2020, likely in early May, for our first volunteer event. Over the next few months, we will be making regular visits to the Ridge Route to assess what section we will work on first. I figure, as the road has been mostly inaccessible for so long, that a location within the closure would be best. As it gets closer, we will finalize a date for the first event on the road. All the information regarding these will be posted here as well as on RidgeRoute.com and SoCalRegion.com. Subscribe to this site, available on the right, to keep up to date with events and information on the Ridge Route.

Beyond getting the agreement and key, the roadway is still closed to motor vehicles between the gates. We are still working with the Angeles National Forest to open the road and get it properly maintained. Our maintenance events are meant to be supplementary, not primary. Our work will at least help keep the roadway in place as much as possible for the time being.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...